NTS Steel Mill
Chonburi, Thailand
This project for the Nakhorn Thai Steel Group was built in two phases for which we undertook the structural design as well as the project management and site supervision.
 
Phase I included the design and construction of the bar and wire rod mill, laboratory and melt shop accommodating overhead cranes with a lifting capacity of up to 100 tonnes.
 
Phase II required the extension of the main facilities of the bar and wire rod mill and the melt shop. The insitu-concrete floor was designed for a live load of up to 5 tonnes/m2 in particular areas and the steel frame structure supported roof trusses of a clear span of 32m.
 
 
project details

client: Nakorn Thai Steel Group
services: Structural Design, Project Management and Site Supervision
period: 1991-96
cost: Baht 5,000 million